OPERATION 100 CHURCHES IN 24 MONTHS · THE KINGDOM BUILDERS COVENANT
THE KINGDOM BUILDERS COVENANT

Operation 100 Churches
in 24 Months

Partner and Donor Prospectus · An invitation from Prophet David Rauf

BECOME A KINGDOM BUILDER →
The VisionOur WorkChurch ModelFundingPartnerships24-Month PlanAccountability
01 / THE VISION

100 additional churches in 100 communities

The Hopespring church planting vision seeks to establish 100 new, operating churches, each with its own permanent building, within 24 months of the formally announced programme start. Each proposed chapel is designed for approximately 100–150 seats.

100additional churches
24months
100–150seats per building
US$2mconstruction target
“A church becomes part of the life of a community. A child can learn the Scriptures there. A family can find encouragement there. A new believer can be discipled there.” — Prophet David Rauf

Church planting includes regular worship, biblical teaching, prayer, evangelism, follow-up for new believers, discipleship, and leadership support. The 10,000–15,000 combined seats represent potential seating capacity, not predicted attendance or membership.

02 / WORK ALREADY UNDERWAY

A vision already taking root

The ministry reports approximately 33 existing chapels constructed in village communities, some with pastors’ residences, and further existing projects under construction. None of these are counted toward the new 100-church target.

Examples of existing ministry locations include Walewale, Zebilla, Garu, Nakpanduri, Bunkpurugu, Nalerigu, Langbinsi and Navrongo. These are examples, not a verified complete register. Individual project status, spelling, dates, and photographs must be checked before being attached to specific locations.

VIEW ORIGINAL MINISTRY PHOTOGRAPHS →

Project profiles will identify verified location, responsible pastor (with consent), building status, dated photographs, and actual attendance where recorded. No unverified names, completion dates or attendance figures are presented here.

03 / WHAT COMPLETION MEANS

More than a building

Congregation

A newly established congregation meeting regularly, with a responsible pastor or ministry leader and a discipleship plan.

Secured site

Documented rights for church use, community consultation and site verification before construction.

Safe permanent chapel

A completed, suitable 100–150-seat building with essential seating, a pulpit and basic worship equipment.

Documented handover

Approved budget, verified location, completion evidence and handover report. Building completion and church completion are reported separately.

Pastors’ residences are optional and separately budgeted; not every existing chapel has one. An unfinished building, purchased plot or rented meeting place will not be counted as a completed church.

04 / FUNDING AND COSTS

How the US$20,000 construction target is planned

The proposed construction target is US$20,000 per chapel × 100 = US$2,000,000. This is a planning target, not a contractor quotation or an all-inclusive price. Every site requires its own approved bill of quantities and estimates.

Illustrative construction allocationUSD
Site preparation and foundation3,000
Walls and structural work5,000
Roof structure and covering4,500
Doors and windows1,500
Flooring, plastering and painting2,000
Basic electrical work1,000
Transport, supervision and construction allowance1,000
Construction contingency2,000
Total construction planning target20,000

Separate approved budgets: land acquisition, furnishing and worship equipment, leadership and church planting support, and campaign administration. Site-specific water, sanitation, accessibility, connections, ground conditions and approvals must also be explicitly costed. Donated land is recorded separately from cash receipts.

05 / SIX WAYS TO PARTNER

Choose how you will build

Seed Bearers

Any amount toward the pooled building fund. The prospectus suggests US$100 or US$200 once or monthly; the website also offers a US$50 entry option.

Territory Pioneers

Provide suitable land or fund an approved land budget, subject to site verification and documentation.

Foundation Builders

Fund a stage or work package. Suggested amounts: US$500, US$1,000, US$2,500, US$5,000 or US$10,000.

Sanctuary Builders

Support one entire building against the US$20,000 construction target, subject to an approved site budget.

Legacy Builders

Fund construction plus approved furnishing and essential equipment. Land is additional unless secured.

Kingdom Visionaries

Support multiple buildings: two for US$40,000, five for US$100,000, or ten for US$200,000 in construction targets, excluding separately budgeted land and equipment.

Give once, monthly, quarterly or by agreed construction milestones. Families, churches, workplaces and groups may jointly adopt an approved project. Pledges are commitments; only cleared receipts count as funds received.

Suggested milestone contributions for one building

StageShareUSD
Approved site budget and mobilisation25%5,000
Foundation and wall stage35%7,000
Roof and enclosure stage25%5,000
Finishing, inspection and handover15%3,000

Partnership titles do not grant property ownership, spiritual rank, ministry authority or guaranteed blessings. Actual disbursements require verified milestones and an agreed contract.

VIEW SPONSORSHIP OPTIONS & BANK DETAILS →
06 / DELIVERY ROADMAP

Four phases across 24 months

PeriodNew churchesCumulativeConstruction budget
Months 1–61010US$200,000
Months 7–122535US$500,000
Months 13–183065US$600,000
Months 19–2435100US$700,000
Total100100US$2,000,000

The delivery clock starts on the formally announced start date. These are proposed targets, not guaranteed completion dates. Site verification, approved budgets, contractor capacity, leadership readiness and available funding determine actual delivery.

Before launch, the prospectus proposes a six-week preparation period for financial controls, approved designs, pilot sites, land records, official giving channels, team appointments and donor reporting procedures.

07 / PARTNER CARE & ACCOUNTABILITY

Clear stewardship and direct communication

Meetings with Papa

Sponsors will be invited to meetings with Prophet David Rauf to hear the vision and discuss progress.

Weekly prayer fellowship

Sponsors will be invited to weekly prayer meetings with the ministry.

Direct monthly updates

Project progress, completed work, photographs when available, and next steps will be shared directly each month.

Financial reporting

The prospectus proposes receipts and acknowledgements, quarterly consolidated updates, and an annual financial and ministry summary.

Programme records will distinguish pledges, cleared contributions, expenditures, balances and in-kind support. Each approved church receives a unique project reference. Public recognition requires donor consent; anonymous giving is respected. Site visits may be arranged where practical and safe.

An independent annual financial review is proposed subject to budget and appointment. Tax deductibility is not promised without confirmed legal eligibility. Designated gifts are governed by agreed written restrictions.

JOIN THE MISSION

100 churches. 24 months.
One Great Commission.

Partner with the Hopespring church planting vision led by Prophet David Rauf in Bolgatanga, Ghana. Matthew 28:19–20 · 1 Corinthians 3:9.

PARTNER WITH US →